Decision owner
Facility manager
The named role remains accountable for the consequential decision.
Real Estate & Construction
Designed for Facility manager
Let the facility manager resolve building faults faster by joining live BMS alarms to the asset's BIM record, O and M manuals, warranty terms and work-order history, so the technician is dispatched with the right procedure, part and warranty posture already determined.
Contract REA-03 · primary aggregate BuildingAssetOperations · mode loading
Decision brief
This brief starts with the decision, evidence, and accountable owner. The guided workflow then shows how the recommendation was produced.
The evidence and control points that shape this recommendation.
Decision owner
Facility manager
The named role remains accountable for the consequential decision.
Governed evidence
6 record types
Structured records and cited text ground the recommendation.
Workflow
5 controlled stages
Each transition records its input, output, status, and audit context.
Human controls
1 approval gate
Approval gates prevent the copilot from making consequential decisions.
Three alarms fire within eight minutes on floor 9: supply air temperature high on AHU-09, static pressure low, and a VAV box damper fault.
Let the facility manager resolve building faults faster by joining live BMS alarms to the asset's BIM record, O and M manuals, warranty terms and work-order history, so the technician is dispatched with the right procedure, part and warranty posture already determined.
WorkOrder gives Facility manager the evidence needed to begin the final governed business outcome, with the decision trail retained for review.
Step 1 of 5
| Field | Value |
|---|
| Field | Value |
|---|
The output appears here immediately. More technical evidence remains available below.
The demonstration keeps deterministic controls, AI assistance, and approval separate.
Source systems enforce identity, workflow order, policy filters, and record updates.
Retrieval and generation assemble relevant evidence into a cited recommendation or draft.
Facility manager verifies material claims and approves the consequential action.
Run the stages in order before using the Copilot. Every stage explains what happens, why it matters, the evidence it uses, and the complete API request and response.
Automated stage
What happens: Building operations assistant performs alarm correlation and triage using BmsAlarm and produces correlatedFaultSignal. The transition is deterministic and does not require autonomous model approval.
Why it matters: correlatedFaultSignal gives Asset resolver the evidence needed to begin Asset and BIM context resolution, with the decision trail retained for review.
Loading relevant sample records.
Ready to run.
POST /api/domain/workflow/alarm-correlation-and-triage
Run this API to see its formatted outcome.
| Field | Value |
|---|
| Field | Value |
|---|
Automated stage
What happens: Asset resolver performs asset and bim context resolution using correlatedFaultSignal and produces BuildingAsset. The transition is deterministic and does not require autonomous model approval.
Why it matters: BuildingAsset gives Retrieval orchestrator the evidence needed to begin Procedure and warranty grounding, with the decision trail retained for review.
Loading relevant sample records.
Ready to run.
POST /api/domain/workflow/asset-and-bim-context-resolution
Run this API to see its formatted outcome.
| Field | Value |
|---|
| Field | Value |
|---|
Automated stage
What happens: Retrieval orchestrator performs procedure and warranty grounding using BuildingAsset and produces ManualProcedureChunk. The transition is deterministic and does not require autonomous model approval.
Why it matters: ManualProcedureChunk gives Building operations assistant the evidence needed to begin Dispatch package drafting, with the decision trail retained for review.
Loading relevant sample records.
Ready to run.
POST /api/domain/workflow/procedure-and-warranty-grounding
Run this API to see its formatted outcome.
| Field | Value |
|---|
| Field | Value |
|---|
Automated stage
What happens: Building operations assistant performs dispatch package drafting using ManualProcedureChunk and produces DispatchRecommendation. The transition is deterministic and does not require autonomous model approval.
Why it matters: DispatchRecommendation gives Facility manager the evidence needed to begin Facility manager dispatch and warranty decision, with the decision trail retained for review.
Loading relevant sample records.
Ready to run.
POST /api/domain/workflow/dispatch-package-drafting
Run this API to see its formatted outcome.
| Field | Value |
|---|
| Field | Value |
|---|
Human approval required
What happens: Facility manager performs facility manager dispatch and warranty decision using DispatchRecommendation and produces WorkOrder. A named human approver must review the evidence before the transition completes.
Why it matters: WorkOrder gives Facility manager the evidence needed to begin the final governed business outcome, with the decision trail retained for review.
Loading relevant sample records.
Ready to run.
POST /api/domain/workflow/facility-manager-dispatch-and-warranty-decision
Run this API to see its formatted outcome.
| Field | Value |
|---|
| Field | Value |
|---|
Run a stage to see its explanation, evidence, full request, and full response.
Ask a question and receive an answer grounded in retrieved BuildingAssetOperations evidence.
Select a starter question or enter your own.
Loaded live from /api/config, /api/domain/model, and
/api/domain/sample.
buildingAssetOperationses/tenantId + /buildingIdThree alarms fire within eight minutes on floor 9: supply air temperature high on AHU-09, static pressure low, and a VAV box damper fault. The assistant correlates them to a single probable supply-fan VFD fault on AHU-09, finds the same fault code twice in the past 14 months, retrieves the manufacturer VFD diagnostic procedure requiring an electrical certification and full lockout-tagout, and determines the unit is 19 months into a 60-month extended warranty that covers the drive but excludes labor. The facility manager dispatches a certified technician with the recommended drive and control board, files the warranty claim for the part, and the closed work order updates the asset condition and recurrence history.
| Container | Role | Hierarchical partition key | Document types |
|---|---|---|---|
buildingAssetOperationses |
Primary | /tenantId + /buildingId |
BuildingAsset, BmsAlarm, WorkOrder, DispatchRecommendation |
equipmentManualLibrary |
Reference | /tenantId + /modelNumber |
ManualProcedureChunk |
warrantyTermsLibrary |
Reference | /tenantId + /warrantyDocId |
WarrantyTermChunk |
| Type | Container | Partition key | Identifier pattern | Embedding fields |
|---|---|---|---|---|
BuildingAsset |
buildingAssetOperationses |
/tenantId + /buildingId |
building::{buildingId}::asset::{assetTag} |
None |
BmsAlarm |
buildingAssetOperationses |
/tenantId + /buildingId |
building::{buildingId}::alarm::{alarmTimestampUtc}::{pointName} |
None |
WorkOrder |
buildingAssetOperationses |
/tenantId + /buildingId |
building::{buildingId}::workorder::{workOrderNumber} |
None |
ManualProcedureChunk |
equipmentManualLibrary |
/tenantId + /modelNumber |
model::{modelNumber}::manual::{manualDocId}::{chunkOrdinal} |
chunkVector |
WarrantyTermChunk |
warrantyTermsLibrary |
/tenantId + /warrantyDocId |
warranty::{warrantyDocId}::{chunkOrdinal} |
chunkVector |
DispatchRecommendation |
buildingAssetOperationses |
/tenantId + /buildingId |
building::{buildingId}::dispatch::{dispatchId} |
rationaleVector |
Show unacknowledged high-priority alarms across the building for the operations board.
buildingAssetOperationses
single-partition
SELECT * FROM c WHERE c.tenantId = @tenantId AND c.buildingId = @buildingId AND c.type = 'BmsAlarm' AND c.alarmPriority IN ('critical','high') AND c.alarmTimestampUtc >= @windowStartUtc AND NOT IS_DEFINED(c.acknowledgedByUpn) ORDER BY c.alarmTimestampUtc DESC
Find whether this asset has failed the same way before, which changes the diagnosis and the warranty argument.
buildingAssetOperationses
single-partition
SELECT * FROM c WHERE c.tenantId = @tenantId AND c.buildingId = @buildingId AND c.type = 'WorkOrder' AND c.assetTag = @assetTag AND c.faultCode = @faultCode ORDER BY c.workOrderNumber DESC
Retrieve the manufacturer procedure matching the exact model and fault category, with its certification and lockout requirements.
equipmentManualLibrary
single-partition
SELECT * FROM c WHERE c.tenantId = @tenantId AND c.modelNumber = @modelNumber AND c.type = 'ManualProcedureChunk' AND c.procedureCategory = @procedureCategory ORDER BY RANK RRF(VectorDistance(c.chunkVector, @queryVector), FullTextScore(c.chunkText, @queryTerms))
Determine whether the asset category and fault date fall inside an active warranty or service contract.
warrantyTermsLibrary
partition-key-fan-out
SELECT * FROM c WHERE c.tenantId = @tenantId AND c.warrantyDocId IN (@buildingWarrantyDocIds) AND c.type = 'WarrantyTermChunk' AND ARRAY_CONTAINS(c.coveredAssetCategories, @assetCategory) AND c.coverageStartUtc <= @faultDateUtc AND c.coverageEndUtc >= @faultDateUtc ORDER BY c.coverageEndUtc DESC